General logic of the powertrain follows,
if the supercapacitor has a voltage rating above the minimum operating value,
it will be activated during the acceleration of high-power demand. The
supercapacitor will handle regenerative braking unless the voltage rating is
above the maximum voltage value. If the SoC reaches the lower value or during
the normal driving period, the battery will activate to power the vehicle.
During this time, the supercapacitor will be charged to the maximum level. This
concept is similar to a parallel hybrid on petrol and battery power system. The
vehicle cycle is divided into acceleration state, regenerative braking, and
coasting state. For the control strategy to function, all power source
requirements for driving phases are seen in equation 1.
P battery + P SC = P acceleration + P
vehicle
A. Coasting
State
The average vehicle power is in the range
of coasting power consumption as power peaks are minimal. As a result, the
supercapacitor is not in use as the battery can cover the traction load power.
This means P acceleration and P SC are
null. The battery pack that covers the power need is seen with equation 2.
P battery = P vehicle
B. Acceleration
State
During acceleration state, the power
demand from the vehicle is high. This means the supercapacitor will be used to power
the vehicle during acceleration unless the supercapacitor voltage is below its
minimal threshold value. This is seen with equation 3.
P SC = P acceleration + P vehicle, ∀ V SC ⩾ V SC Min
C. Regenerative
Braking State
The supercapacitor will receive all power
from the braking. The supercapacitor will handle regenerative braking unless
the supercapacitor voltage is above its maximal threshold value. The power
profile is seen with equation 4.
P vehicle = P SC, ∀ V SC ⩽ V SC Max
The supercapacitor will charge during
braking unless the voltage reaches the maximum SC operating voltage. During
this scenario, the supercapacitor voltage will match its maximum rating and the
power will transfer to the battery pack, which is shown in equation 5.
P vehicle =
P bat, ∀ V SC = V SC Max
No comments:
Post a Comment