Sunday, April 12, 2020

Vehicle Testing Configuration

 Circuit configuration for the vehicle testing setup is finalized in figure 4. Instead of a diode, a MOSFET with body diode is placed, which allows for acceleration when MOSFET is off and regenerative braking when MOSFET is on. When the pulse switch is on, the battery voltage is combined with supercapacitor voltage (equation 3). When the pulse switch is off, the supercapacitor voltage is passed through the diode, excluding the battery voltage (equation 4). In the system, the average voltage will be between supercapacitor voltage and combined voltage, which will be proportional to time spent on t on in period t total.

MOSFET On: V bat + V SC           

MOSFET Off: V SC                         




The battery and supercapacitor are in series, which means the voltage are summoned. Equation 1 shows the total motor power including the armature resistance from the motor. Equation 2 distributes the power supply to each energy source. This shows as the amount of supercapacitor voltage contribution increases, the battery power contribution can decrease.

P motor = I arm (V b + VSC) – I2 arm R arm                  (1)

P motor = V b I arm + VSC I a – I2 arm R arm                (2)




Control Board Activated

Time to let my photography skills shine. Here is the first control board built for the vehicle testing. 



Saturday, April 11, 2020

Vehicle Modules

To simulate an accurate power draw of an electric vehicle, a light electric vehicle was deployed for testing. The vehicle weighs 11.8 kg, consists of differentials, and runs four-wheel drive using a single DC motor. Figure 7 shows the vehicle with all components. 


The vehicle largely consists of a supercapacitor (Maxwell 55 F 15 V), a battery (12 V 10 ah), and the controller module. The supercapacitor’s voltage was altered during each testing to see the effect of current flow to the battery.


The motor constantly received 12 V as the goal of the research is to design a configuration with constant voltage output. The vehicle can run without supercapacitor with the bypass. When the supercapacitor is active, the controller reads the voltage value from the supercapacitor, which is used to control the PWM pulse rate. Equation 6 shows the PWM cycle rate calculation based on supercapacitor voltage for the empirical testing, which was used to program the PWM. The pulse duty updated each millisecond based on the data retrieved from the supercapacitor voltage.

12 V = V SC + 12 V bat ( t ON / t OFF )       (6)


Monday, April 6, 2020

Series Config Mathematical Calculation

As current is proportional to torque and voltage to speed of the motor, equal voltage from battery or battery/supercapacitor results in same amount of current required to move the vehicle at a certain speed. This means when the pulse switch is on, the battery current will be equal to battery/motor system. However, as the supercapacitor covers partial amount of power during the initial acceleration, the battery is discharging at a pulse rate, which means the average of the current lower than battery/motor system. A simulation was performed with the assumption of ideal circuit to power a 12 V motor powering the electric vehicle. Initially, the supercapacitor voltage was set to 9 V and battery voltage set to 3 V. During the 10 second simulation, the supercapacitor voltage deceased to 0 V and the battery’s pulse rate increased to match the 12 V mark. 


Figure a shows the changes in system voltage. As the supercapacitor voltage decreases linearly, the battery voltage increases to match the output voltage of 12 V. Figure b shows the current draw of power sources which is not as straightforward as the voltage graph. During the initial acceleration, higher amount of torque is required to accelerate the vehicle, which results in higher current draw at the initial phase. After, the current load is decreased linearly in the simulation. Using the light electric vehicle model, initial current required was found: 21 A. Based on the battery voltage required, which is calculated using equation 5, average current was calculated with the same method as calculating the average voltage, which is the duty cycle fraction value multiplied by the total current. Without the supercapacitor, the battery current marks the blue area of the graph. With the supercapacitor, the battery current marks the green area of the graph. The simulation shows reduction in average battery voltage and current, which results in reduction in battery power required to move the vehicle during acceleration. 




Series Configuration Design

The battery and the supercapacitor is connected in series to powers the DC motor. The motor voltage is the combined voltage value from the two power sources. During acceleration, the motor voltage decrease as supercapacitor discharges. This is not preferred in the powertrain design as motor controller is simpler to program with constant input voltage.



PWM and a second path for the supercapacitor to power the motor when PWM is off should be added. This configuration also requires a diode, which prevents the battery from short circuiting. The PWM controls the amount of battery voltage to the system, which means as the supercapacitor voltage decreases, the PWM pulse rate can increase to achieve a constant voltage output to the DC motor. This design also allows for regenerative braking between the motor and the supercapacitor as the PWM can block battery connection. However, this design does not allow for a bypass of the supercapacitor, which is necessarily during normal driving phase as the supercapacitor is not in use. 


Bypass is added in figure 3. The supercapacitor can perform power assistance during vehicle acceleration and supercapacitor retrieves all energy during regenerative braking. During normal driving phase, the battery is the sole powering source and the supercapacitor is inactive.










2nd Generation EV

     A Control board was developed for testing the power load draw of the vehicle. The basic component of the board consists of a motor cont...